3 Railway Bridges
Neckartal
New Build
Transport and Infrastructure
MAX BÖGL Stiftung & Co. KG
Neckartal
Civil Engineering Structure Design
Structural Design
completed
As part of the Stuttgart–Ulm new high-speed line, three railway bridges were planned to cross the Neckar Valley and district road K 1219. The structures were designed as three-span continuous girders with spans of up to 50 m. Our services included structural design as well as special services relating to construction logistics. The planning took into account the local conditions, the adjacent existing structures, and the operational requirements of the railway.