Horb High Bridge
Horb am Neckar
New Build
Transport and Infrastructure
Leonhardt, Andrä und Partner Beratende Ingenieure VBI AG
Horb am Neckar
BIM Consulting
Civil Engineering Structure Design
Overall BIM Coordination
Structural Design
under construction
As part of the Horb bypass (B32), the Horb High Bridge is creating a new, high-capacity crossing of the Neckar Valley — a new landmark above the valley, often described as the “Golden Gate Bridge of the Black Forest.” The structure is one of the region’s key infrastructure projects, delivering a future-ready connection with long spans and a striking structural form.
As a subcontractor to Leonhardt, Andrä und Partner, acting on behalf of PORR Deutschland, BuP. Boll Beraten und Planen contributes selected services within the scope of execution planning, together with BIM-based design coordination. We support the implementation with a focus on safe, efficient, and transparently coordinated project delivery.