New construction of Bosch GmbH
Leonberg
New Build
Office Buildings
Research and Laboratory Buildings
Leonig GmbH & Co. KG
Leonberg
Overall BIM Coordination
under construction
With the planned site expansion in Leonberg, Bosch intended to consolidate its research and development departments for driver assistance systems and automated driving on a central campus site. The Lr70 campus building was designed as the entrance to the site and, with approximately 1,400 workplaces, was intended to create a modern environment for innovation, collaboration, and future-oriented working.
The six-storey new building, approximately 26 metres high, was planned with a terraced design, stepping down southwards from Römerstraße. Greened and accessible roof and terrace areas, two inner courtyards, and an atrium shaped the architectural concept. The ground floor was to accommodate the main access areas, food service facilities, a canteen, and a daycare centre. The design was complemented by a two-level underground car park with spaces for around 250 cars and 200 bicycles.
Sustainability was a central element of the design: large-scale photovoltaic areas, extensive green roofs, and the integration of DGNB certification into the planning process were planned. BuP. Boll Beraten und Planen was responsible for the overall BIM coordination — from model coordination and quality assurance, including the BIM approval process and clash detection, through to the preparation of model-based execution and handover for building operation.