Wilhelmhospital Conversion
Stuttgart
Conversion of Existing Structures
Extension
Healthcare Buildings
Diakonie-Klinikum Stuttgart
Stuttgart
Structural Design
completed
At the Stuttgart site, the Wilhelmhospital was comprehensively converted and extended within the existing structure. The project focused on the functional and structural development of the existing hospital building, while creating additional floor area through a modular vertical extension.
The construction was implemented under demanding conditions: during ongoing hospital operations and with consideration for listed building elements. Temporary support and safeguarding measures ensured the necessary structural stability and the safe operation of the hospital throughout the entire construction period. In addition, a connecting element to the adjacent building sections was realized as a separate structure and integrated into the overall concept.